Lot 1 (Archer-0.75km, Luzige-0.3km, Mengo Hill-0.75km, Mpabana-0.75km, Mutebi-0.45km, Nakivubo Channel-0.5km, Namirembe-Luwuum street-1.5km and Semugooma-0.4km Roads in KCCA Central Division) |
Test pit excavation to 1m every 0.2m and DCP to 1m at every 0.2m. Laboratory testing (CBR, MDD, PSD, Atterberg’s limits, chemical tests). Material sourcing and identification for borrow pits, sand, water and quarries, report writing