Despite its short time of existence, the experience of GETLAB Ltd is enormous as its team has previously worked at problematic sites such as deep swamps, remote access sites and steep sloping sites, and as a result developed sufficient technical capacity to overcome complex challenges. The key projects we have experience on include;

Date Project  Client Status
June 2016 todate Lot 1 and Lot 4 Soils and Materials Testing for selected KCCA roads in Central DivisionLot 1 (Archer-0.75km, Luzige-0.3km, Mengo Hill-0.75km, Mpabana-0.75km, Mutebi-0.45km, Nakivubo Channel-0.5km,Namirembe-Luwuum street-1.5km and Semugooma-0.4km Roads in KCCA Central Division) PLot 4 (Dembe Kirowooza-3.0km,  Kigoowa-1.9km, Kimera-1.4km, Kisalita-0.7km, Kisosonkole-1.0km, Kiziri-0.75km, Magambo-0.9km and Robert Mugabe-1.8km Roads) Stirling Civil Engineering Limited Ongoing
May 2016 todate Geotechnical Investigations for Detailed Design of Lusalira-Kasambya-Nkonge-Ssebabule Road (97 km) Comptran Engineers and Planning Associates
Ongoing
May 2016 todate Lot 6- Soils and Materials Testing for selected KCCA roads Kiru General Services Ltd Ongoing
February, 2015 Geotechnical And Materials Investigation For The Design And Build Contract Of Namanve Northern Wing Completed
February, 2015 Geotechnical Investigation – Proposed Pretreatment Plant Site – Kinawataka GKW under National Water And Sewerage Corporation (NWSC).
Completed
March, 2015 Geotechnical Investigations For The Detailed Design And Construction Of Bushenyi Water Supply And Sanitation Project PEC Limited and EGIS under National Water And Sewerage Corporation(NWSC).
Completed
March, 2015 Borehole Drilling And Laboratory Testing Of Nakivubo And Kinawataka Sewer Lines Of Lake Victoria Protection II (LVP II) Project GKW under National Water And Sewerage Corporation (NWSC).
Completed
April, 2015 Laboratory Testing Services For Upgrading Of Musita Lumino And Busia Majanji Road Project To Bituminous Standards. 18th BUREAU under Uganda National Roads Authority (UNRA).
Completed
May, 2015 Geotechnical Investigation – Kabaale Bridge At Kyankwanzi In Association With GEOVEST Limited Terrain Services Limited Under Uganda National Roads Authority (UNRA).
Completed
June, 2015 Geotechnical And Materials Investigation Of Consultancy Services For Collection Of Preliminary Engineering Design Data For Design And Build For Upgrading Of Mbale-Nkokonjeru Road (21km) And Mbale State Lodge Loop (6km) PEC Limited Under Uganda National Roads Authority (UNRA).
Completed
July, 2015 Geotechnical And Materials Investigations For The Consultancy Services For Preliminary And Detailed Engineering Design Of Selected Roads Links And Junctions/ Intersections To Improve Mobility In Kampala City In Association With Geovest SMEC Under Kampala City Council Authority.
Completed
August, 2015 Geotechnical investigations for proposed international specialised hospital in Lubowa, Wakiso District ROKO/FINASI GROUP Completed
September, 2015 Geotechnical Investigations for Waki Hydro Power Plant Dott Services Limited Completed
September 2015 Geotechnical Investigations for proposed Uganda Vinci Coffee Factory in Namanve, Mukono District ROKO/FINASI GROUP Completed
December, 2015 to February, 2016 Geotechnical Investigations for Nkenda and Hoima Substations Shandong Takai Power Engineering Co. under Uganda Electricity Transmission Company Limited (UETCL) Completed
July, 2015 to March 2016 Geotechnical Investigation Of Lot 1-Nkenda-Hoima 220kv Double Circuit Over Head Transmission Line (226km) Fichtner And KEC International Ltd Under Uganda Electricity Transmission Company Limited (UETCL).
Completed
January, 2016 Soil Investigations for Luweero-Butalangu and Butalangu Ngoma Road Dr. Gilbert Kasangaki and UNRA.
Completed
March, 2016 Soil Investigations for Design and Build of Northern Estate road at Kampala Industrial Business Park Professional Engineering Consultants Limited and Stirling Civil Engineering Co. under UIA.
Completed
March, 2016 Geotechnical and Structural Intergrity Assessment at the Proposed Ntinda Vocational Institute United Nations Office for Project Services (UNOPS) Completed
July, 2015 to May, 2016 Geotechnical Investigation Of Kawanda Masaka Transmission Line Performed. The Works Include Temporary Platform Construction For Access In Water Logged Swamps, Borehole Drilling, Sampling, SPTs, Laboratory Testing And Reporting. For KEC International Ltd Under Uganda Electricity Transmission Company Limited (UETCL). Completed
April to May, 2016 Geotechnical Investigations for the Feasibility and Detailed Design of Namungalwe, Ikumbya and Kaliro Tank Reservoir Sites and Bugobi Water Treatment Plant and Tank Sites Bright Technical Services Ltd Completed
December, 2014 Concrete Mix Design For The Proposed Vocational Training Institute, Martyrs Road Ntinda Performed HANSOL EC Limited Completed
December, 2014 Foundation Investigation of Plot 1, Katalima Bend , Naguru, Kampala COIL Limited Completed
November, 2014 Geotechnical And Materials Investigation Of Ndejje Road , Namasuba In Wakiso District MBJ Technologies Limited Under Ministry Of Works And Transport,Uganda.
Completed