Hoima substation (1 BH to 15m, 7BH to 8m, 7 test pits to 1m depth, SPT every 1m depth, undisturbed and disturbed soil sampling to full depth of the boreholes, soil resistivity tests on site, water table monitoring ,laboratory test [PSD, Atterberg’s limits, MDD, CBR, chemical tests, shear strength, consolidation]) |